{"id":808,"date":"2017-04-26T15:43:11","date_gmt":"2017-04-26T15:43:11","guid":{"rendered":"http:\/\/fivebridgestrust.ca\/wp\/?p=808"},"modified":"2017-07-18T00:19:55","modified_gmt":"2017-07-18T00:19:55","slug":"nine-mile-river-bridge-project-closer-to-installation","status":"publish","type":"post","link":"https:\/\/fivebridgestrust.ca\/wp\/?p=808","title":{"rendered":"Nine Mile River Bridge Project &#8211; Closer to Installation"},"content":{"rendered":"<h1>Volunteer Crews Attach Lumber<\/h1>\n<p><a href=\"https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Getting-wooden-abutments-ready-on-the-Nine-Mile-River-bridge.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-809 alignleft\" src=\"https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Getting-wooden-abutments-ready-on-the-Nine-Mile-River-bridge-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Getting-wooden-abutments-ready-on-the-Nine-Mile-River-bridge-300x169.jpg 300w, https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Getting-wooden-abutments-ready-on-the-Nine-Mile-River-bridge-768x432.jpg 768w, https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Getting-wooden-abutments-ready-on-the-Nine-Mile-River-bridge.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><a href=\"https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Nine-Mile-River-Bridge-getting-ready.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-810 alignleft\" src=\"https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Nine-Mile-River-Bridge-getting-ready-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" \/><\/a>Yesterday in the sunshine, volunteer crews working with project leader Mike Marriott, Trust Board Member and President of the local Safety-Minded ATV Association, prepared the new steel bridge for installation across the Nine Mile River.<\/p>\n<p>Depending on weather conditions, the bridge will be fully installed and secured within the next few weeks. \u00a0This 5-year project is finally coming to its completion.<\/p>\n<p>Wonderful achievement for the Trust, project supporters and volunteers involved. \u00a0The new structure will allow trail users safe <a href=\"https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Ready-for-installation-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-811 alignleft\" src=\"https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Ready-for-installation-2-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Ready-for-installation-2-300x169.jpg 300w, https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Ready-for-installation-2-768x432.jpg 768w, https:\/\/fivebridgestrust.ca\/wp\/wp-content\/uploads\/2017\/04\/Ready-for-installation-2.jpg 1024w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a>access for years to come and replaces an old wooden structure from the 1980s.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Volunteer Crews Attach Lumber Yesterday in the sunshine, volunteer crews working with project leader Mike Marriott, Trust Board Member and President of the local Safety-Minded ATV Association, prepared the new steel bridge for installation across the Nine Mile River. Depending on weather conditions, the bridge will be fully installed and secured within the next few&#8230; <\/p>\n<div class=\"link-more\"><a href=\"https:\/\/fivebridgestrust.ca\/wp\/?p=808\">Read More<\/a><\/div>\n","protected":false},"author":3,"featured_media":810,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-808","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nine-mile-river-bridge-project"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=\/wp\/v2\/posts\/808","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=808"}],"version-history":[{"count":3,"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=\/wp\/v2\/posts\/808\/revisions"}],"predecessor-version":[{"id":814,"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=\/wp\/v2\/posts\/808\/revisions\/814"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=\/wp\/v2\/media\/810"}],"wp:attachment":[{"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=808"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=808"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fivebridgestrust.ca\/wp\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=808"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}